advanced search

Welcome: Guest

log in

Deep Research Report on Cost and Price of China Wind Power Equipment

2009

Publication Date October 2009
Publisher QY Research Group
Product Type Report
Pages 40
ISBN Number not applicable
Product Code QYR00021

Summary

Abstract:

'2009 Deep Research Report on Cost and Price of China Wind Power Equipment' is specifically for wind power equipment investment, It is used primarily for Development and Reform Commission to project a thematic study. By the end of 2008, 11638 sets of Wind turbine have been installed with a total installed capacity of 12.17GW. With the rapid development of China's wind power industry, advanced and efficient wind power equipment will maintain a stable growth in market demand. But in recent years China's wind power equipment industry appeared investment rush into mass action, repeat introduction and redundant construction. Thus the Development and Reform Commission timely introduced some relevant control measures to inhibit wind power industry overcapacity.

Since August 1st of 2009, the wind power electricity price benchmark in Chinese four resource areas will be 0.51 RMB (0.074 USD) Kw/h, 0.54 RMB (0.079 USD) Kw/h, 0.58 RMB (0.085 USD) Kw/h, and 0.61 RMB (0.089 USD) Kw/h separately. We believe that the new pricing policy will have a favorable impact to enhance the operator's profitability and stimulate the development of China's wind power industry.

In the report, we conduct a detailed investigation and analysis on the costs, prices, and profit margins of wind turbine, blade, gear boxe, bearing and other key parts. We predict the trends of Cost and Price in the next few years and make feasibility analysis of some key projects.We also analysis the prospects of wind farms operating in four Wind resource areas for investors to make investment decisions and reference.

Content

  • Chapter One Wind power equipment industry overview
    • 1.1 Wind power equipment industry Chain
    • 1.2 Wind Turbine blade industry Chain
    • 1.3 Wind gearbox industry Chain
    • 1.4 Wind bearings industry Chain
  • Chapter Two Wind power equipment Cost Price Profit Margin Analysis
  • Chapter Three Wind Turbine blade Cost Price Profit Margin Analysis
  • Chapter Four Wind gearbox Cost Price Profit Margin Analysis
  • Chapter Five Wind Spindle Bearing Cost Price Profit Margin Analysis
  • Chapter Six Generator Cost Price Profit Margin Analysis
  • Chapter Seven Yaw bearing Cost Price Profit Margin Analysis
  • Chapter Eight Pitch bearing Cost Price Profit Margin Analysis
  • Chapter Nine Wind power industry chain Cost Price Investment opportunities Profitability analysis
  • Chapter Ten Feasibility Analysis of Wind Farm Operation
  • Chapter Eleven Research Summary
  • Tables and Figures
    • Figure Stucture of Wind power equipment industry chain
    • Figure Structure of Wind turbine
    • Table Wind turbine industry chain (Blade Bearing gearbox Electronic Control System Generators Wind farm operators, etc.) Companies List
    • Figure Permanent magnet direct-drive generator internal structure
    • Figure Wind Turbine Blade Industry Chain Structure
    • Figure Wind Turbine Blade Structure
    • Figure Wind Gear Box Industry chain structure
    • Figure Wind bearing Industry Chain Structure
    • Figure Wind Power bearing distribution in the wind turbine
    • Table 2008-2013 750KW Wind turbine (Tower blade wheel bearings gear box, etc.)Detailed cost List
    • Figure 750KW Wind turbine Cost structure
    • Table 2008-2013 750KW Wind turbine Cost Price(10K RMB/set)Profit Margin List
    • Figure 750KW Wind turbine Cost structure
    • Table 2008-2013 1.5MW Wind turbine (Tower blade wheel bearings gear box, etc.)Detailed cost List
    • Figure 1.5MW Wind turbine Cost structure
    • Table 2008-2013 1.5MW Wind turbine Cost Price(10K RMB/set)Profit Margin List
    • Table 2008-2013 2.0MW Direct Drive Wind turbine (Tower blade wheel bearings gear box, etc.)Detailed cost List
    • Figure 2.0MW Direct-drive wind turbine Cost structure
    • Table 2008-2013 2.0MW Permanent magnet direct-drive wind turbine Cost Price(10K RMB/set)Profit Margin List
    • Table 2008-2013 750KW Wind Turbine bladeCost Price(10K RMB/set)Profit Margin List
    • Table 2008-2013 1.5MW Wind Turbine bladeCost Price(10K RMB/set)Profit Margin List
    • Table 2008-2013 2.0MW Wind Turbine bladeCost Price(10K RMB/set)Profit Margin List
    • Table 2008-2013 750KW Wind gearbox Cost Price(10K RMB/set)Profit Margin List
    • Table 2008-2013 1.5MW Wind gearbox Cost Price(10K RMB/set)Profit Margin List
    • Table 2008-2013 750KW Wind Spindle Bearing Cost Price(10K RMB/set)Profit Margin List
    • Table 2008-2013 1.5MW Wind Spindle Bearing Cost Price(10K RMB/set)Profit Margin List
    • Table 2008-2013 2.0MW Wind Spindle Bearing Cost Price(10K RMB/set)Profit Margin List
    • Table 2008-2013 750KW Generator Cost Price(10K RMB/set)Profit Margin List
    • Table 2008-2013 1.5MW Generator Cost Price(10K RMB/set)Profit Margin List
    • Table 2008-2013 2.0MW Permanent magnet direct-drive Generator Cost Price(10K RMB/set)Profit Margin List
    • Table 2008-2013 750KW Yaw bearing Cost Price(10K RMB/set)Profit Margin List
    • Table 2008-2013 1.5MW Yaw bearing Cost Price(10K RMB/set)Profit Margin List
    • Table 2008-2013 2.0MW Yaw bearing Cost Price(10K RMB/set)Profit Margin List
    • Table 2008-2013 750KW Pitch bearing Cost Price(10K RMB/set)Profit Margin List
    • Table 2008-2013 1.5MW Pitch bearing Cost Price(10K RMB/set)Profit Margin List
    • Table 2008-2013 2.0MW Pitch bearing Cost Price(10K RMB/set)Profit Margin List
    • Table Wind power industry chain Cost Price Investment opportunities Profitability analysis
    • Table 2009 China Wind Turbine Blade Opportunity and Risk List
    • Table Feasibility Analysis of 400 sets/year 1.5MW Wind Turbine Blade (VARTM)
    • Table 400 sets/year 1.5MW Wind Turbine Blade (VARTM) Project Raw materials (glass fiber resin, etc.) Consumption and cost analysis
    • Table 400 sets/year 1.5MW Wind Turbine Blade (VARTM) Project Costs, expenditure analysis
    • Table 400 sets/year 1.5MW Wind Turbine Blade (VARTM) Project Output, income analysis
    • Table 400 sets/year 1.5MW Wind Turbine Blade (VARTM) Project Profitability, payback period analysis
    • Table 2009 China Wind Gear Box project Opportunity and Risk List
    • Table 800sets/year 1.5MW Wind Gear Box project Feasibility Analysis
    • Figure 800sets/year 1.5MW Wind Gear Box project Cost Analysis
    • Figure 800sets/year 1.5MW Wind Gear Box project Production cost structure
    • Table 800sets/year 1.5MW Wind Gear Box project Production Revenue Profit Payback period Analysis
    • Table I Wind Resource Area 49.5MW Wind farm gross generation (MWh) On-grid electricity (MWh) sales (million) carbon dioxide emission reductions (t) CDM revenues detailed calculations List
    • Table II Wind Resource Area 49.5MW Wind farm gross generation (MWh) On-grid electricity (MWh) sales (million) carbon dioxide emission reductions (t) CDM revenues detailed calculations List
    • Table III Wind Resource Area 49.5MW Wind farm gross generation (MWh) On-grid electricity (MWh) sales (million) carbon dioxide emission reductions (t) CDM revenues detailed calculations List
    • Table IV Wind Resource Area 49.5MW Wind farm gross generation (MWh) On-grid electricity (MWh) sales (million) carbon dioxide emission reductions (t) CDM revenues detailed calculations List
    • Table V 49.5MW Wind Farm Project (1.5MW * 33 sets) Investment Cost List
    • Table I II III IV Wind Resource Area Wind Farm Project payback period profits List
Delivery Details

PDF:Delivered by email within 12 to 24 hours (Mon-Fri) UK business hours

PRINT/CD-ROM:Despatched within 1 to 2 working days.

Industry Events