In 2007, China's total investment in its general equipment industry reached CNY23.41 billion, up 49.4% year on year, or 14.6 percentages higher than growth rate of investment in China's manufacturing industry in the same period. In the fourth quarter of 2007, enterprise booming indicator of China's general equipment industry was 153.2, 3.7 percentage points lower than the third quarter, but 12.2 percentages higher than that of manufacturing industry in the same period.
In 2007, output of some products in China's general equipment industry increased rapidly, and for instance, the growth rates of fork truck, gas compressor and refrigerating & air conditioning equipment output were 41.14%, 40.40% and 37.95% respectively. However, some products like separating machines, electric boilers and power station hydro turbine, had a negative growth, down 0.02%, 0.32% and 2.46% respectively.
Although impacted by international anti-dumping cases and domestic export rebate policy, production scale of China's general equipment industry has not declined rapidly, and the competitive edges of the industry have increased further.
However, investment enthusiasm and production and sales ratio have decreased, and stock has gone up. Production scale of the whole industry will maintain a momentum of stable growth, and price index will continue to rise, while enterprise booming index will stay at a high level.
The report makes an in-depth study and analysis on China's general equipment industry development in 2007 and also makes forecasts on the development of the industry in 2008.
Content
- Power Generation Capacity of Each Province (Municipality and Autonomous Region) in 2006
- Power Output of Each Province (Municipality and Autonomous Region) in 2006
- Use Time of Power Generating Unit of Each Province (Municipality and Autonomous Region) in 2006
- Station Service Power Consumption Rate of Power Plants of Each Province (Municipality and Autonomous Region) in 2006
- Coal Consumption of Power Plants of Each Province (Municipality and Autonomous Region) in 2006
- Heat Supply of Each Province (Municipality and Autonomous Region) in 2006
- Total Electricity Consumption of Each Province (Municipality and Autonomous Region) in 2006
- Statistics of China Coal-fired Power Plants with Installed Capacity of One Million KW or above in 2006
- Statistics of China Hydropower Plants with Installed Capacity of One Million KW or above in 2006
- Statistics of China Nuclear Power Plants with Installed Capacity of One Million KW or above in 2006
- Statistics of State Grid Corporation of China
- SGCC Power Generation in Operation Regions
- SGCC Power Generation Capacity in Operation Regions
- SGCC Power Output in Operation Regions
- Electricity Consumption in SGCC Operation Regions
- Total Electricity Consumption in SGCC Operation Regions
- Circuit Length of Overhead Line in SGCC Operation Regions
- Number of Overhead Lines and Length of Pole Lines in SGCC Operation Regions
- Cable and DC Line in SGCC Operation Regions
- Public Transformers in SGCC Operation Regions
- Self-provided Transformers in SGCC Operation Regions
- Converter Stations in SGCC Operation Regions
- Converter Capability and DC Transmission Capacity of SGCC Converter Stations
- Statistics of China Southern Power Grid Co., Ltd.
- Overview of Southern Power Gird in 2006
- Power Generation Capacity and Power Output in Five Provinces (Regions) in South China in 2006
- Power Structure in Five Provinces (Regions) in South China in 2006
- Power Generation Capacity of Power Plants in Five Provinces (Regions) in South China in 2006
- Basic Situation of Electric Power in Five Provinces (Regions) in South China in 2006
- Unified Dispatching Load of China Southern Power Grid in 2006
- Electricity Exchange of China Southern Power Grid in 2006
About this Product
Delivery Details
PDF:Delivered by email within 12 to 24 hours of placing the order (Mon-Fri)
PRINT/CD-ROM:Despatched within 2 to 4 working days.
Related Products
Recently Viewed Products
Energy & Utilities
call +44 (0) 20 7060 7474
or email us
Resources
Why Report Buyer?
Advertising/Affiliates
View Our Publishers
News
About Us
Market Publishers
Meet Us
Jobs
Contact Us
Categories and Subcategories