Prefeasibility Report on Five star Hotel
| Publication Date | June 2008 |
|---|---|
| Publisher | Cygnus |
| Product Type | Report |
| Pages | 106 |
| ISBN Number | not applicable |
| Product Code | CYG00066 |
Summary
Introduction
The number of tourists visiting to India is likely to soar to 10 million in the year 2010 from its current level of 5 million in 2007-08. Recent estimate shows that India has a shortage of 150,000 rooms fuelling hotel room rates across India.
Scope of the report
At the backdrop of such a conducive business atmosphere 'Pre-feasibility Report on Five-star Hotel Industry' attempts to examine such critical factors which will provide vital inputs in general to the potential investors and estimation of commercial viability of such an investment.
- It presents the market analysis of Indian hotel industry in terms of structure
- It analyses the steps involved in setting up a hotel describing the technical
aspects in terms of locational details and land requirement.- It assess the manpower planning and financial estimate involved in setting up a hotel.
- brings an insight into the procedure for setting up a hotel, type of machinery
- It provides the final conclusion stating that the project is viable under the given conditions.
Reasons to Buy
- Spot opportunity to set up a hotel under the given conditions
- Suggests a project plan with all required information
- Provides a thorough understanding about the various parameters to be considered to set up a hotel
- Sample financial analysis is given to examine the financial viability with their inputs for a project.
Content
- CONTENTS SYNOPSIS Executive Summary Highlights
- 1. Project Concept
- 2. Industry Analysis
- 2.1 Overview of Indian Hotel Industry
- 2.1.1 Introduction
- 2.2 Structure & Segmentation of Hotel Industry
- 2.2.1 Budget Hotels
- 2.2.2 One and Two Star Hotels
- 2.2.3 Three & Four Star Hotels
- 2.2.4 Five star & Above Category Hotel
- 2.3 Market Size and Growth Rate
- 2.4 Major Hotel Chains
- 2.5 Growth Drivers
- 2.1 Overview of Indian Hotel Industry
- 3. Project Details
- 3.1 Steps Involved in Setting up a Hotel
- 3.2 Technical Aspects
- 3.2.1 Locational Details
- 3.2.1.1 Demographic Details
- 3.2.1.1 Tourism in Bangalore
- 3.2.1.2 Major Players
- 3.2.2 Land Requirement
- 3.2.2.1 Floor Planning
- 3.2.2.3 Facilities Available
- 3.2.2.4 Room Plans
- 3.2.2.5 Permissions & Clearances Required
- 3.2.1 Locational Details
- 3.3 Manpower Planning
- 3.3.6 Marketing & Promotional planning
- 3.3.6 Scheme for Market Development Assistance (MDA)
- 3.3.7 Mobilising Bank Loan
- 3.3.8 Critical Success Factor
- 3.3.9 Key Concerns
- 3.4 Financial Estimate
- 3.4.1 Project Cost
- 3.4.2 Sources of Fund
- 3.4.3 Disbursement, Moratorium Period & Repayment schedule
- 3.4.4 Revenue Model & Projection
- 3.4.5 Expenditure
- 3.4.6 Revenue & Profitability Projection
- 3.4.7 Working Capital Requirement
- 3.4.8 BEP & IRR
- 3.4.9 Ratio Analysis
- 3.4.10 Sensitivity Analysis
- 4. Conclusion Annexure- 1: Bibliography Annexure- 2: Providers of important products/ services Annexure- 3: Financing Pattern Annexure- 4: Details of Project Cost Annexure- 5: Financing Pattern Annexure- 6: Loan Repayment Schedule & Interest Calculation Annexure- 7: Income Projection Annexure- 8: Depreciation Schedule Annexure- 9: Working Capital Annexure- 10: Manpower cost Annexure- 11: Operating Cost Annexure- 12: Projected P & L Statement Annexure- 13: Projected Balance Sheet Annexure- 14: Cash Flow Statement & IRR Annexure- 15: DSCR in the base Case Annexure- 16: Ratio Analysis Annexure- 17: Sensitivity Analysis
- List Of Tables
- Table 2.1: Minimum Statutory Size of Rooms
- Table 2.2: Criteria for One and Two Star Hotels
- Table 2.3: Criteria for Three and Four Star Hotels
- Table 2.4: Criteria for Five Star and Five Star Deluxe Hotels Table-
- 2.5: Profile of different types of visitors & their preferences
- Table 2.6 Total inventory of rooms in 4 and 5 star categories (Bangalore)
- Table 2.7: Daily average revenue levels of 5 star hotels in Bangalore
- Table 2.8: Occupancy levels in 5 star hotels in Bangalore
- Table 2.9: Demand Supply gap of Hotel rooms in Bangalore (Four and Five Star Categories)
- Table 2.10: Key financial Indicators (Hotel Leela Venture)
- Table 2.11: Key financial Indicators (Indian Hotels Company Limited)
- Table 2.12: Key financial Indicators (East India Hotels Ltd)
- Table 2.13: Key financial Indicators (Taj GVK Hotels)
- Table 3.1: Floor Space Allocation
- Table 3.2: Conference and Convention capacity
- Table 3.3: List of Permissions & Clearances
- Table 3.4: Manpower Requirement
- Table 3.5: Cost of the Project
- Table 3.6: Financing Pattern
- Table 3.7: Tentative Loan Disbursement Schedule Table-
- 3.8: Calculation of Average Room Rent
- Table 3.9: Schedule of Income
- Table 3.10: Estimated Manpower & Cost
- Table 3.11: Revenue & Profitability Projection
- Table 3.12: Level of Capacity Utilization
- Table 3.13: Working Capital Calculation
- Table 3.14: Break even point
- Table 3.15: Ratio Analysis
- Table 3.16: DSCR in different scenarios
About this Product
Delivery Details
REPORT:Despatched within 3 to 5 working days.
Related Products
Recently Viewed Products
- Despite Thinner Wallets - Credit Crunch Won’t Stop Londoners Eating Out >>
- Digital TV set to reach 274 million households in Western Europe and the US by 2012 >>
- Creative Advertising by Companies Keeps U.S. Teen and Tween Grooming Products Market on the Rise >>
- Internet Media Giants Drive Increased Spending on Social Network Advertising >>
Leisure & Media
call +44 (0) 20 7060 7474
or email us
Resources
Why Report Buyer?
Advertising/Affiliates
View Our Publishers
News
About Us
Market Publishers
Meet Us
Jobs
Contact Us
Categories and Subcategories














