TSGENCO – Kothagudem Thermal Power Plant: Unit VII 800 MW – Telangana - Project Profile

TSGENCO – Kothagudem Thermal Power Plant: Unit VII 800 MW – Telangana - Project Profile

  • December 2017 •
  • 7 pages •
  • Report ID: 4432870
Synopsis
"TSGENCO – Kothagudem Thermal Power Plant: Unit VII 800 MW – Telangana - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "TSGENCO – Kothagudem Thermal Power Plant: Unit VII 800 MW – Telangana - Project Profile" is part of Timetric’s database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary
The Telangana State Generation Corporation (TSGENCO) is undertaking the construction of a thermal power plant in Telangana, India.

The project involves the construction of 800MW coal-fired thermal power plant. It includes the construction of coal washing unit, water transmission pipeline, raw water storage tanks, switch yard for power evacuation, powerhouse and substation, the installation of turbines, generators and transformers, and the laying of transmission lines.

In October 2014, Bharat Heavy Electricals Limited (BHEL) signed a memorandum of understating (MoU) with TSGENCO to undertake the project on engineering, construction, and procurement (EPC) basis.

In January 2015, BHEL was awarded the US$601 million EPC contract.

On January 9, 2015, TSGENCO submitted a detailed project report to the government.

On January 24, 2015, the project obtained environmental clearance approvals from National Board for Wildlife.

On July 28, 2015, the project received approval from the Union Ministry for Forests and Environment to proceed with the construction of the project.

On August 11, 2015, TRF was appointed as the supply contractor for the stacker along with reclaimer package.

In October 2015, Punj Lloyd was appointed as enabling contractor. The scope of works includes civil, structural and architectural work of the non-plant works and raw water reservoir, roads, and drains.

Construction activities are underway and scheduled to be completed in December 2017.

Scope
The project involves the construction of 800MW coal-fired thermal power plant adjacent to existing Kothagudem Thermal Power Station in Paloncha, Khammam district, Telangana.

The US$829 million project includes the following:
1. Construction of a coal washing unit
2. Construction of water transmission pipeline
3. Construction of raw water storage tanks
4. Construction of a switch-yard for power evacuation
5. Construction of a powerhouse
6. Construction of a substation
7. Installation of turbines
8. Installation of generators
9. Installation of transformers
10. Laying of transmission lines

Reasons To Buy
• Gain insight into the project.
• Monitor the latest project developments.
• Identify key project contacts.
Loading...

We are very sorry, but an error occurred.
Please contact support@reportbuyer.com if the problem remains.

Country=India Industry=Construction ParentIndustry=HeavyIndustry Date=201712 Topic=Supply Publisher=Timetric Price=1000