NTPC – Kolodyne Stage II Hydro Electric Plant 460 MW – Mizoram - Project Profile

NTPC – Kolodyne Stage II Hydro Electric Plant 460 MW – Mizoram - Project Profile

  • December 2017 •
  • 7 pages •
  • Report ID: 4473462
Synopsis
"NTPC – Kolodyne Stage II Hydro Electric Plant 460 MW – Mizoram - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "NTPC – Kolodyne Stage II Hydro Electric Plant 460 MW – Mizoram - Project Profile" is part of Timetric’s database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary
NTPC Ltd (NTPC), also known as National Thermal Power Corporation Ltd, is planning to build a hydro electric power plant in Mizoram, India.

The project involves the construction of a 460MW (4 X 115MW) hydro power plant on 200ha of land.

It includes the construction of a powerhouse, a spillway, intake structures, gates, control rooms, a substation, access roads and related infrastructure, the installation of pumps, generators, turbines and transformers, and the laying of transmission lines.

In January 2009, NTPC entered into an agreement with the Government of Mizoram (GoM) for the implementation of the project on build, own, operate and maintain (BOOM) basis. In accordance with the agreement, NTPC shall supply 13% free power from the project to Mizoram.

The corporation also agreed to supply 15% power at the tariff, to be determined by the Central Electricity Regulatory Commission (CEAC), over and above the normal share of Mizoram as per the existing power-sharing formula, subject to the concurrence of the Ministry of Power, India.

On August 16, 2010, GoM framed and finalized the Hydro Electric Power Policy (HEPP) of Mizoram 2010 for the efficient execution of the project.

On September 14, 2011, NTPC and CEAC entered into an agreement for the development.

However, the project faced subsequent delays over issues with Government policies and approvals from the Ministry of Environment, Forest and Climate Change (MoEFCC).

In March 2014, the State Forest Department of Mizoram (SFFoM) forwarded the proposed plans to the MoEFCC.

In October 2014, GoM accorded NTPC for designate the project as a lower priority development.

Government of India stated NTPC to submit the revised DPR for the project.

Scope
The stage II project involves the construction of a 460MW (4 X 115MW) hydro power plant on 200ha of land on the Kolodyne River in Mizoram.

The US$605 million project includes the following:
1. Construction of a powerhouse
2. Construction of a spillway
3. Construction of intake structures
4. Construction of gates
5. Construction of control rooms
6. Construction of a substation
7. Construction of access roads
8. Installation of pumps
9. Installation of generators
10. Installation of turbines
11. Installation of transformers
12. Laying of transmission lines

Reasons To Buy
• Gain insight into the project.
• Monitor the latest project developments.
• Identify key project contacts.
Loading...

We are very sorry, but an error occurred.
Please contact support@reportbuyer.com if the problem remains.

Country=India Industry=Hydropower ParentIndustry=HeavyIndustry Date=201712 Topic=Supply Publisher=Timetric Price=1000