1 report

Out of the four wind farms one of the farm has been in operation since May ##, 2016; the other three are in the planning or construction phase and should be connected to the network between 2017 and 2018.

  • Electrical Grid
  • Wind Farm
  • Asia
  • Switzerland
  • BKW Group