"MoPWH – Rotiklot Dam Development – East Nusa Tenggara- Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "MoPWH – Rotiklot Dam Development – East Nusa Tenggara- Project Profile" is part of Timetric’s database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary
The Government of Indonesia (GoI), through the Ministry of Public Works and Housing (MoPWH), is undertaking the construction of Rotiklot Dam in East Nusa Tenggara, Indonesia.

The project involves the construction of a dam, a control building and related amenities on a 12.3ha area, a spoil bank on a 5.43ha area, a stock pile on a 2.83ha area, access roads, a helipad, spillways, sluiceways, a head regulator, shingle excluder ducts, feeder channels, an intake tunnel, a concrete diaphragm wall, driveways, public facilities and other related infrastructure facilities on a 68.43ha area.

The project features a 42m high dam with a peak width of 10m, as well as long-peak 397.23m on a 4.41ha area with a storage capacity of 2.9 million m3 of water.

In July 2014, feasibility study was completed.

On November 24, 2015, MoPWH appointed a consortium of PT Nindya Karya and PT Universal Suryaprima as construction contractor.

PT. Indra Karya, PT Patria Jasa Nusa Prakarsa and PT Arga Pasca Rencana have been appointed as consulting engineers.

The project will be funded from the state government.

In December 2015, construction works on the project commenced

In March 2017, 44% of the construction works completed.

Construction activities are underway with completion scheduled in March 2018.

Scope
The project involves the construction of a 42m high dam with a storage capacity of 2.9 million m3 of water in East Nusa Tenggara, Indonesia.

The US$33 million project includes the following:
1. Construction of spillways
2. Construction of sluiceways
3. Construction of a head regulator
4. Construction of feeder channels
5. Construction of an intake tunnel
6. Construction of a helipad
7. Construction of a dam on a 4.41ha area
8. Construction of a spoil bank on a 5.43ha area
9. Construction of a stock pile on a 2.83 ha area

10. Construction of access roads

11. Construction of other related infrastructure

12. Installation of related equipment

Reasons To Buy
• Gain insight into the project.
• Monitor the latest project developments.
• Identify key project contacts.
Loading...

We are very sorry, but an error occurred.
Please contact support@reportbuyer.com if the problem remains.

Country=Indonesia Industry=Construction ParentIndustry=HeavyIndustry Date=201801 Topic=Supply Publisher=Timetric Price=1000