"NEA/MPEMR – Sun Koshi II Hydroelectric Power Plant 1110 MW – Nepal- Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "NEA/MPEMR – Sun Koshi II Hydroelectric Power Plant 1110 MW – Nepal- Project Profile" is part of Timetric’s database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary
The Nepal Electricity Authority (NEA) and Ministry of Power, Energy and Mineral Resources (MPEMR) are planning to build a hydroelectric power plant near Sun Koshi in Nepal.

The project involves the construction of a 1,110MW hydroelectric power plant. It includes the construction of a powerhouse, control rooms, a substation, access roads and related infrastructure, the installation of generators, turbines and transformers, and the laying of transmission lines.

Japan International Cooperation Agency (JICA) has been appointed as study consultant.

In August 2013, feasibility study was conducted for the project.

In January 2014, Asian Development Bank (ADB) signed a loan agreement of US$9.7 million to help fund in the study of the project.

On October 16, 2016, NEA and MPEMR signed an agreement to develop the project.

Planning activities are underway.

Scope
The project involves the construction of a 1,110MW hydroelectric power plant near Sun Koshi in Nepal.

The US$2,600 million project includes the following:
1. Construction of a powerhouse
2. Construction of control rooms
3. Construction of a substation
4. Construction of access roads
5. Installation of generators
6. Installation of turbines
7. Installation of transformers
8. Laying of transmission lines
9. Construction of related infrastructure

Reasons To Buy
• Gain insight into the project.
• Monitor the latest project developments.
• Identify key project contacts.
Loading...

We are very sorry, but an error occurred.
Please contact support@reportbuyer.com if the problem remains.

Country=Nepal Industry=Construction ParentIndustry=HeavyIndustry Date=201801 Publisher=Timetric Price=1000