Synopsis
"UJVNL – Vyasi Hydroelectric Power Plant 120 MW – Uttarakhand - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "UJVNL – Vyasi Hydroelectric Power Plant 120 MW – Uttarakhand - Project Profile" is part of Timetric’s database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary
The Uttarakhand Jal Vidyut Nigam Ltd (UJVNL) is undertaking the construction of Vyasi Hydroelectric Power Plant project on Yamuna River in Uttarakhand, India.

The project involves the construction of 120MW (2X60MW) hydroelectric power plant.

It includes the construction of an 86m tall concrete gravity dam, a 2.7km head race tunnel of 7.0m diameter, a surface powerhouse, a substation, the installation of two semi umbrella generators of 60MW each, two Vertical Francis turbines, and the laying of transmission lines.

UJVNL submitted reviewed report of the project to Central Power Authority in July 2010 and techno-economic approval was granted in October, 2011.

In August 2012, Forest Advisory Committee approval secured.

In October 2013, National Projects Construction Corporation Ltd (NPCC) was appointed as contractor for the construction of powerhouse and Gammon India Ltd as construction contractor for civil works.

In November 2013, construction work on the project commenced.

In March 2014, Bharat Heavy Electricals Ltd (BHEL) was awarded US$20 million contract to design, manufacture, supply, install and commission the hydro generating sets and associated electromechanical works.

In anuary 2017, 40% of construction activities has been completed.

Construction activities are underway and scheduled to be completed by December 2018.

Scope
The project involves the construction of 120MW (2X60MW) power plant on Yamuna River in Dehradun district of Uttarakhand, India.

The US$220 million project includes the following:
1. Construction of a substation
2. Construction of an 86m tall concrete gravity dam
3. Construction of a 2.7km head race tunnel of 7.0m diameter
4. Construction of a surface powerhouse
5. Construction of diversion works
6. Construction of a substation
7. Installation of two Semi Umbrella Generator of 60MW each
8. Installation of two vertical Francis turbines
9. Installation of surge shaft of 18.0m diameter and 63.50m height
10. Installation of two pressure shafts of 4.0m diameter and 209m length
11. Laying of transmission lines

Reasons To Buy
• Gain insight into the project.
• Monitor the latest project developments.
• Identify key project contacts.
Loading...

We are very sorry, but an error occurred.
Please contact support@reportbuyer.com if the problem remains.

Country=India Industry=Construction ParentIndustry=HeavyIndustry Date=201803 Topic=Supply Publisher=Timetric Price=1000