NTPC – Talcher Coal Based Thermal Power Plant Expansion 1320 MW – Odisha - Project Profile

NTPC – Talcher Coal Based Thermal Power Plant Expansion 1320 MW – Odisha - Project Profile

  • January 2018 •
  • 7 pages •
  • Report ID: 4530515
Synopsis
"NTPC – Talcher Coal Based Thermal Power Plant Expansion 1320 MW – Odisha- Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "NTPC – Talcher Coal Based Thermal Power Plant Expansion 1320 MW – Odisha- Project Profile" is part of Timetric’s database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary
National Thermal Power Corporation (NTPC) is planning to undertake the Talcher Coal Based Thermal Power Plant Expansion project in Angul district, Odisha, India.

The project involves the expansion of the existing power plant by 1,320MW.

The project includes the construction of new coal washing unit, water transmission pipeline, raw water storage tanks, switchyard for power evacuation and powerhouse, the installation of turbines and generators, and the laying of transmission lines.

The project is planned to be developed under two phases with the construction of 660MW power units in each phase.

The project will adopt an advanced super critical technology that would reduce carbon dioxide emission besides burning less fuel with higher output.

In Fourth Quarter of 2010, a public hearing for expansion of the plant was held, but later it was cancelled on expiry of two years.

On April 29, 2017, the Government of Odisha approved the project plans.

Planning activities are underway.

Scope
The project involves expansion of the existing power plant by 1,320MW at Angul district, Odisha, India.

The US$1,193 million project includes the following:
1. Construction of a coal washing unit
2. Construction of a water transmission pipeline
3. Construction of raw water storage tanks
4. Construction of switchyard for power evacuation
5. Construction of powerhouse
6. Installation of turbines and generators
7. Laying of transmission lines

Reasons To Buy
• Gain insight into the project.
• Monitor the latest project developments.
• Identify key project contacts.
Loading...

We are very sorry, but an error occurred.
Please contact support@reportbuyer.com if the problem remains.

Country=India Industry=ElectricPower ParentIndustry=HeavyIndustry Date=201801 Publisher=Timetric Price=1000