"JCC/MCC/SCC – DTS Katowice-Jaworzno Highway – Silesian Voivodeship - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "JCC/MCC/SCC – DTS Katowice-Jaworzno Highway – Silesian Voivodeship - Project Profile" is part of Timetric’s database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary
The City Councils of Jaworzno (JCC), Myslowice (MCC) and Sosnowiec (SCC) are planning to construct the DTS highway connecting Katowice to Jaworzno in Silesian Voivodeship, Poland.

The project involves the construction of 14km, 6-lane highway, a tram lane and a bike path alongside the highway. It also includes the reconstruction of existing roads, construction of interchanges, overpasses, and related infrastructure facilities.

The project will be divided into two sections as follows:

Section I: It includes the construction of the road from Wezel Lwowska to Obrzezna Zachodnia. This section is expected to cost US$35 million.

Section II: It includes the construction of the road from Wezel Partyzantów to Wezel Jezor. It is expected to cost US$45 million.

In July 2013, the Jaworzno, Myslowice and Sosnowiec councils signed a cooperation agreement and announced their plans to invest on the DTS Katowice-Jaworzno highway project.

Egis Polska and Incom were appointed as the feasibility study consultant with a scheduled timeline of 13 months to prepare a detail study report including transport study, traffic level research, and a survey to be conducted on over 30,000 of inhabitants of the Katowice region.

The project is expected to receive financing from EU funds, the section one through Regional Operational Programme of the Silesia Voivodeship and the second section through ‘Territorial Contract’ signed between the government and local authorities.

Egis is in process of preparing design documentation and JCC, MCC and SCC are in the process of the obtaining the funds for the project.

Scope
The Drogowa Trasa Srednicowa (DTS) Katowice-Jaworzno project includes the construction of a 14km highway in Silesian Voivodeship, Poland.

The US$80 million project includes the following:
1. Construction of 14km, 6-lane highway
2. Construction of a tram lane, bike path alongside the highway
3. Construction of interchanges
4. Construction of overpasses
5. Construction of bicycle path alongside the highway
6. Reconstruction of existing roads

Reasons To Buy
• Gain insight into the project.
• Monitor the latest project developments.
• Identify key project contacts.
Loading...

We are very sorry, but an error occurred.
Please contact support@reportbuyer.com if the problem remains.

Country=Poland Industry=Construction ParentIndustry=HeavyIndustry Date=201803 Topic=Forecast Publisher=Timetric Price=1000