"NTDC – Thar to Matiari HVAC Transmission Line – Pakistan - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "NTDC – Thar to Matiari HVAC Transmission Line – Pakistan - Project Profile" is part of Timetric’s database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary
National Transmission & Despatch Company Ltd (NTDC) is undertaking the construction of a transmission line from Thar to Matiari in Pakistan.

The project involves the construction of a 245km, 500kV high-voltage alternating current (HVAC) transmission line and is planned to be executed under two Lots.

The Lot I involves the construction of a 110km, 500kV double circuit Quad Bundle Transmission Line starting from Thar on especially designed towers (Zone A).

The Lot II involves the construction of a 135km, 500kV Double Circuit Quad Bundle Transmission Line terminating at Matiari on conventional towers (Zone B).

The project also includes the construction of substations and the installation of transformers and feeder systems.

SNC-Lavalin International Inc. has been appointed as lead consultant, Nippon Koei Co. Ltd as surveyor, NESPAK Pvt. Ltd as study consultant and consulting engineer.

In January 2015, NTDC invited bids from engineering, procurement and construction (EPC) contractors with a submission deadline of March 26, 2015.

On January 22, 2016, NTDC signed the EPC contract with Northeast No.2 Electric Power Construction Company (NEPC II) Consortium for the construction of Lot I. The scope of work includes design, manufacture, supply, installation, testing and commissioning of the transmission line. NEPC II Consortium was the only bidder.

In January 2017, the project has been funded with US$61.2 million by Askari Bank Ltd, Dubai Islamic Bank Pakistan Ltd and Faysal Bank Ltd.

Construction works are underway and are scheduled to complete in June 2018.

Scope
The project involves the construction of a 245km, 500kV HVAC transmission line from Thar to Matiari in Pakistan.

The US$210 million project includes the following:
1. Construction of a 110km, 500kV Double Circuit Quad Bundle Transmission Line starting from Thar
2. Construction of a 135km, 500kV Double Circuit Quad Bundle Transmission Line terminating at Matiari
3. Construction of substations
4. Installation of transformers
5. Installation of feeder systems

Reasons To Buy
• Gain insight into the project.
• Monitor the latest project developments.
• Identify key project contacts.
Loading...

We are very sorry, but an error occurred.
Please contact support@reportbuyer.com if the problem remains.

Country=Pakistan Industry=Construction ParentIndustry=HeavyIndustry Date=201803 Topic=Supply Publisher=Timetric Price=1000