NYCDoT – Brooklyn Bridge Rehabilitation – New York - Project Profile

NYCDoT – Brooklyn Bridge Rehabilitation – New York - Project Profile

  • March 2018 •
  • 8 pages •
  • Report ID: 4907554
Synopsis
"NYCDoT – Brooklyn Bridge Rehabilitation – New York - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "NYCDoT – Brooklyn Bridge Rehabilitation – New York - Project Profile" is part of Timetric’s database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary
The New York City Department of Transportation (NYCDoT) is undertaking the construction of Bridge Rehabilitation project in New York, the US.

The project involves the rehabilitation of a 1,833m Brooklyn Suspension Bridge with reconstruction of the entire length of Tillary Street, from Cadman Plaza West to Navy Street, adjacent portions of Adams Street and from the bridge to Tech Place.

The project will include the construction of the surfacing over the bridge’s masonry arch blocks, new drainage system, support structures, and seismic retrofitting, the expansion of first ramp connecting the exit from the bridge, second ramp, connecting the southbound FDR Drive with the approach to bridge’s Brooklyn-bound lanes and third ramp, connecting the bridge’s Brooklyn-bound lanes to Cadman Plaza West and Old Fulton Street in Brooklyn Heights, and the installation of waterproofing seal and slabs of pavement in segments, repainting the bridge’s steel, the steel decks on the approach ramps will be removed in sections and replaced panel by panel with precast concrete-filled steel.

ENTECH ENGINEERING, P.C. has been appointed as surveyor.

NYCDoT will secure US$30 million from American Recovery and Reinvestment Act (ARRA), New York City capital funds will finance US$286 million and the remaining US$192 million by other federal funding sources.

In October 2009, Skanska USA Building Inc. was appointed as main contractor for the project.

On June 2, 2010, construction works commenced and are underway.

Scope
The project involves the rehabilitation of the 1,833m Brooklyn suspension bridge at Brooklyn, in New York City, the US.

The US$811 million project includes the following:
1. Reconstruction of pedestrian ways
2. Redevelopment of public transport systems
3. Replacement of steel decks with precast concrete-filled steel
4. Installation of slabs of pavements
5. Expansion of existing ramps
6. Construction of related facilities

Reasons To Buy
• Gain insight into the project.
• Monitor the latest project developments.
• Identify key project contacts.
Loading...

We are very sorry, but an error occurred.
Please contact support@reportbuyer.com if the problem remains.

Country=UnitedStates Industry=CivilEngineering ParentIndustry=HeavyIndustry Date=201803 Publisher=Timetric Price=1000