AES – Huntington Beach Generating Station Redevelopment 844 MW – California - Project Profile

AES – Huntington Beach Generating Station Redevelopment 844 MW – California - Project Profile

  • March 2018 •
  • 8 pages •
  • Report ID: 4927957
Synopsis
"AES – Huntington Beach Generating Station Redevelopment 844 MW – California - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "AES – Huntington Beach Generating Station Redevelopment 844 MW – California - Project Profile" is part of Timetric’s database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary
AES Southland LLC (AES) is undertaking to redevelop the HBGS in Orange County, California, the US.

The project involves the construction of an 844MW power plant on 11.6ha of land. It includes the demolition of existing plant, construction of a powerhouse, a substation, gas storage tanks and related facilities, the installation of turbines and generators, and the laying of transmission lines.

The project will be developed in phases.

The phase one includes a two-on-one combined-cycle natural gas-fired turbine (CCGT) configuration with two General Electric (GE) Frame 7FA.05 gas turbines and two heat recovery steam generators (HRSGs) without supplemental firing, a steam turbine generator (STG), an air-cooled condenser, a closed-loop air-cooled heat exchanger, a natural gas-fired auxiliary boiler and related ancillary equipment, with nominal summer capacity of 644MW and phase 2 will be replaced by two GE LMS-100 PB simple-cycle gas turbine (SCGT) units with a nominal capacity of 200 MW.

CH2M HILL has been appointed an engineering consultant and Kiewit Power Constructors Co. as EPC contractor.

On October 29, 2014, California Energy Commission (CEC) approved the development.

In November 2014, AES entered into a 20-year Power Purchase Agreement (PPA) to supply Southern California Edison.

On September 09, 2015, AES submitted a revised amendment.

On March 22, 2016, AES submitted the repowering request to California Independent System Operator Corporation (CAISO).

On April 6, 2016, AES submitted complete materials needed for reviewing the repowering request to CAISO.

As of June 2016, The South Coast Air Quality Management District (SCAQMD) is in plans to approve the development.

In July 2016, Southern California Edison (SCE) and CAISO completed the assessment of repowering request.

In September 2016, AES submitted revised and updated response to Data Request A6 (Air Quality) to California Energy Commission (CEC).

Construction of phase one commenced in the second quarter of 2017 with commercial operation in 2020. Construction of the second phase is expected to begin in the first quarter of 2022 with commercial operation in 2024.

Scope
The project involves the construction of a 844MW gas fired power plant on 11.6ha of land in California, the US.

The US$1,000 million project includes the following:
1. Demolition of existing plant
2. Construction of a powerhouse
3. Construction of a substation
4. Construction of gas storage tanks
5. Installation of turbines
6. Installation of generators
7. Installation of a closed-loop air-cooled heat exchanger
8. Installation of a natural gas-fired auxiliary boiler
9. Laying of transmission lines

Reasons To Buy
• Gain insight into the project.
• Monitor the latest project developments.
• Identify key project contacts.
Loading...

We are very sorry, but an error occurred.
Please contact support@reportbuyer.com if the problem remains.

Country=UnitedStates Industry=ElectricPower ParentIndustry=HeavyIndustry Date=201803 Topic=Supply Publisher=Timetric Price=1000