MINERG – Caculo Cabaca Hydroelectric Power Plant 2171 MW – Malanje - Project Profile

MINERG – Caculo Cabaca Hydroelectric Power Plant 2171 MW – Malanje - Project Profile

  • March 2018 •
  • 7 pages •
  • Report ID: 4956550
Synopsis
"MINERG – Caculo Cabaca Hydroelectric Power Plant 2171 MW – Malanje - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "MINERG – Caculo Cabaca Hydroelectric Power Plant 2171 MW – Malanje - Project Profile" is part of Timetric’s database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary
The Ministry of Energy and Water (MINERG) is undertaking the construction of the 2,171MW Caculo Cabaca hydroelectric power plant over on River Kwanza, Malanje Province, Angola.

The project involves the construction of a dam, a plant, water tunnels, channel leakage tunnels and substations, the installation of turbines and the laying of transmission lines.

In addition to six power generating units in the plant’s primary powerhouse, the developers are keen to add a second powerhouse with a single 65.5MW unit at the bottom of the facility.

COBA - Consultores de Engenharia e Ambiente is responsible for the basic project preparation and elaboration of tender documents.

In June 2015, a joint venture by China Gezhouba Group Corporation (CGGC), Boreal investments Limited and CGGC&NIARA Holding, Lda won the construction contract.

In December 2016, Banco Industrial e Comercial da China has granted a loan of US$4.5 billion to Angola to finance the construction of the hydroelectric dam.

In August 2017, construction works commenced.

Construction activities are underway.

Scope
The project involves the construction of a 2,171MW Caculo Cabaca hydroelectric power plant over on River Kwanza, Malanje Province, Angola.

The US$4,532 million project includes the following:
1. Construction of a dam
2. Construction of a power plant
3. Construction of water tunnels
4. Construction of channel leakage tunnels
5. Construction of substations
6. Installation of turbines
7. Laying of transmission line

Reasons To Buy
• Gain insight into the project.
• Monitor the latest project developments.
• Identify key project contacts.
Loading...

We are very sorry, but an error occurred.
Please contact support@reportbuyer.com if the problem remains.

Country=Angola Industry=Construction ParentIndustry=HeavyIndustry Date=201803 Publisher=Timetric Price=1000