"NTPC – Amochu Reservoir Hydroelectric Power Plant 540 MW – Samchi - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "NTPC – Amochu Reservoir Hydroelectric Power Plant 540 MW – Samchi - Project Profile" is part of Timetric’s database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary
National Thermal Power Corporation (NTPC) is planning to construct the Amochu Reservoir Hydroelectric Power Plant project in Dorokha, Bhutan.

The project involves the construction of a 540MW hydroelectric power plant, 250m height dam, head race tunnel of about 1,000m long with a diameter of nine meters with two spillways, pressure shaft, diversion flood tunnel of 1,200m, powerhouse, substation and access roads.

The Bhutan Government and India Government have signed an agreement to construct Amochu Reservoir project at Dorokha, Bhutan in early 2009.

The Detailed Project Reports (DPR) for the project was prepared by the NTPC. Most of the drilling and drifting works was completed in March 2011.

The Detailed Project report (DPR) was approved by Construction Equipment Association (CEA).

Scope
The project involves the construction of a 540MW hydroelectric power plant in Dorokha, Bhutan.

The US$500 million project includes the following:
1. Construction of a 250m height dam
2. Construction of a powerhouse
3. Construction of a substation
4. Construction of the transmission lines
5. Construction of the access roads
6. Construction of 1,000m head race tunnel with a 9m diameter
7. Construction of the two spillways
8. Construction of a pressure shaft
9. Construction of a diversion flood tunnel of 1,200m
10. Installation of the turbine and generators

Reasons To Buy
• Gain insight into the project.
• Monitor the latest project developments.
• Identify key project contacts.
Loading...

We are very sorry, but an error occurred.
Please contact support@reportbuyer.com if the problem remains.

Country=Bhutan Industry=Construction ParentIndustry=HeavyIndustry Date=201802 Publisher=Timetric Price=1000