MoE – Malenga Hydroelectric Power Plant 62 MW – Malawi - Project Profile

MoE – Malenga Hydroelectric Power Plant 62 MW – Malawi - Project Profile

  • January 2018 •
  • 6 pages •
  • Report ID: 5120460
Synopsis
"MoE – Malenga Hydroelectric Power Plant 62 MW – Malawi- Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "MoE – Malenga Hydroelectric Power Plant 62 MW – Malawi- Project Profile" is part of Timetric’s database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary
Malawi’s Ministry of Energy, Malawi (MoE) is planning to undertake the construction of Malenga Hydroelectric Power Plant project in Malawi.

The project involves the construction of a hydroelectric power plant to generate 62MW power. It includes the construction of a dam, a powerhouse, a substation, service roads, the installation of turbines, transformers, generators, the laying of transmission lines.

In June 2013, MoE presented the development proposals at Japan International Cooperation Agency (JICA) international center.

In March 2015, the project received fund for the feasibility study from U.S. Trade and Development Agency (USTDA) to support the development.

In October 2015, MRIGlobal was selected as technical assistance study consultant.

Scope
The project involves the construction of a hydroelectric power plant able to generate 62MW power in Malawi.

The US$330 million project includes the following:
1. Construction of a dam
2. Construction of a powerhouse
3. Construction of a substation
4. Construction of service roads
5. Installation of turbines
6. Installation of transformers
7. Installation of generators
8. Laying of transmission lines

Reasons To Buy
• Gain insight into the project.
• Monitor the latest project developments.
• Identify key project contacts.
Loading...

We are very sorry, but an error occurred.
Please contact support@reportbuyer.com if the problem remains.

Country=Malawi Industry=Construction ParentIndustry=HeavyIndustry Date=201801 Publisher=Timetric Price=1000